3535 N. Dixie Hwy             office (734) 322-0225
Monroe, MI 48162                fax (734) 322-2949
cell (734) 755-1908

Projects

Institutional Health Care Projects


Institutional – HealthCare Projects Experience:

U of M Hospital - Ann Arbor, MI

1. C.S. Mott Children's and Women's Hospital.

 

St. Joseph's Mercy Hospital - Ann Arbor, MI

1. New Hospital Wing Addition.

 

Oakwood Hospital and Medical Center - Dearborn, MI

1.  Cancer Center, Labor & Delivery Addition & Utility Additions and Renovations.

 

Pontiac Osteopathic Hospital - Pontiac, MI

1.  9-Story Patient Tower Addition, Pre-op, Post-op, Operating Rooms, Dietary, Patient Rooms, Mech. Utility Plant.

 

Harper Hospital Detroit Medical Center - Detroit, MI

1.  4-Story Vic Wertz Clinical Cancer Center.

2.  Cardiac Catheterization Lab Renovations.

 

St. John Hospital and Medical Center - Detroit, MI

1.  Emergency Room Renovations and Additions.

2.  MRI Unit Renovations and Additions.

 

Bethania Regional Healthcare Center - Wichita Falls, TX

1.  Expansion and Renovation, Emergency Room, Operating Rooms, Pre-op, Post-op, Boiler Room Upgrades.

 

Beaumont Hospital - Royal Oak, MI Campus

1.  Anatomic Pathology Lab.

2.  Bulk Oxygen Emergency Back-up System.

3.  Surgical Training Center Commissioning.

 

Beaumont Hospital - Troy, MI Campus

1.  Second Floor Steam Hot Water Generator Replacement Project.

2.  Connector Bridge 3D CAD Mech. Trades Coordination.

3.  East Addition 3D CAD Mech. Trades Coordination.

 

Botsford Hospital - Farmington Hills, MI

1.  New Endoscopy Suites.

2.  New Emergency Room and Operating Room Addition, Laboratories, Operating Rooms and support areas.

3.  Labor & Delivery rooms, Dietary Department, Commercial Kitchen & dining facilities, Central Sterile Supply and Rooftop Heliport.

 

Mount Clemens General Hospital - Mount Clemens, MI

1.  4-Story Heart Center.

 

BIM Projects


Motor City Casino Hotel - Detroit, MI

Ron George Design worked with the lead plumbing contractor and the engineer to provide CAD coordination for the Motor City Hotel in Detroit, Michigan. This hotel is a 17 story 400 room hotel. Many trades were involved in this fast pace project and coordination was a key component to the success of this project. The plumbing system for this project consisted of multiple pressure zones and water heaters which stood out in the CAD coordination process because it allowed these items to be coordination and installed correctly the first time. The coordinated drawings were used by the field to install all of the plumbing required for the hotel rooms, kitchens, mechanical rooms, fitness room and spa.

 

Henry Ford Hospital - West Bloomfield, MI

Ron George Design worked with the lead plumbing contractor to provide 3D CAD coordination for the new Henry Ford Hospital patient tower addition in West Bloomfield, Michigan. This project consisted of a 4 story patient tower addition to the existing hospital. The hospital was a great project to use BIM on because there are so many services and trades in a hospital. BIM also allowed the changes made by the owner during construction much easier to manage and coordinate with the work already coordinated and installed. The coordinated drawings were used by the field to install all of the plumbing required for the hospital including the medical gas system for the patient rooms and the other related areas of the hospital.

 

GM Powertrain, Engine Test Facility - Pontiac, MI

Ron George Design worked with the lead plumbing contractor to provide 3D CAD coordination for the new Engine Test Facility for GM Powertrain in Pontiac, Michigan. This project consisted of a 2 story addition along with a new central plant. The first floor was primarily the engine test cells and common areas for servicing the test cells and the second floor was all mechanical rooms to service the areas below. The Engine test Cell facility was a great project to use BIM on because of the sheer size of this project. The coordination process allowed the roof conductors and overflow roof conductors to be installed exactly where they needed to be the first time and still miss all the other trades. The coordinated drawings were used by the field to install all of the plumbing required for the hospital including the non potable water system.

 

Pfizer Pharmaceutical Building 36 - Ann Arbor, MI

Ron George Design worked with the lead mechanical piping contractor to provide CAD coordination for Pfizer Pharmaceutical’s new Building 36 in Ann Arbor, Michigan. This project consisted of a 4 story addition with the top floor being the mechanical room. CAD coordination was key on this project as the ceiling spaces were very small due to matching the new floor elevations to the existing floor elevations. We were responsible for all of the steam, condensate, chilled water and heating hot water in the building and getting it from the existing tunnel and into the new building to all of the equipment. The coordinated drawings were used by the field to install all piping included the steam PRV stations and control stations for the AHU’s.

 

St. Joes Patient Tower Addition - Ann Arbor, MI

Ron George Design worked with the lead plumbing and piping contractor to provide 3D CAD coordination for the new St. Joes Patient Tower Addition in Ann Arbor. This project consisted of a 8 story patient tower addition to the existing hospital. The hospital was a great project to use BIM on because there are so many services and trades in a hospital. BIM also allowed the changes the owner made during construction much easier to manage and coordinate with the existing work already installed and coordinated to make the ceiling heights as high as possible in the basement. The coordinated drawings were used by the field to install all of the plumbing and piping required for the hospital including the medical gas system for the patient rooms and the other related areas of the hospital. The use of BIM also allowed us to work with the contractor and get sleeves installed before the concrete was poured and also get bang its for hangers installed for the major pipe racks before the concrete was poured which saved many man hours in the field.

 

U of M C.S. Mott's Children's and Women's Hospital - Ann Arbor, MI

Ron George Design worked with the lead plumbing and piping contractor to provide 3D CAD coordination for the new UofM C.S. Mott’s Children’s and Women’s Hospital in Ann Arbor. This project consisted of a new 12 story hospital with an estimated cost of over 550 Million dollars and over 1.1 million square feet. The hospital was a great project to use BIM on because there are so many services and trades in a hospital. The coordinated drawings were used by the field to install all of the plumbing required for the hospital including the medical gas system for the patient rooms and the other related areas of the hospital. The use of BIM allowed a vast majority of the hospital to be built in the virtual world before the building was even built in the field and allowed the coordination to stay ahead of the construction schedule. Ron George Design did the entire medical gas system along with the plumbing roof conductors for this building and some of the HVAC piping.

 

Oakwood Southshore Medical Center – Trenton, MI

Ron George Design worked with the lead plumbing contractor to provide CAD coordination for the new hospital addition to Oakwood Southshore Medical Center in Trenton Michigan. This project consisted of a 5 story addition to the existing hospital with the top floor being shell space for future built out of the patient rooms. This hospital matched some of the floor elevations of the existing hospital and others has slight elevation changes which allowed the tight ceiling spaces to be coordinated on schedule. The coordinated drawings were used by the field to install all of the plumbing required for the hospital including the medical gas system for the patient rooms, OR’s and the other related areas of the hospital. This hospital had a wide array of services needed for the hospital addition compared to the size of the addition which included new lounge, auditorium, OR’s and central sterile, patient rooms, offices, medical storage, mechanical rooms and a floor for future build out. The CAD coordination process allowed all of these different areas of the hospital to be coordinated efficiently.

 

St. Joes OR Addition and Hospital Renovation - Pontiac, MI

Ron George Design worked with the lead plumbing contractor to provide CAD coordination for the new OR addition to St Joes Hospital in Pontiac, Michigan. This project consisted of a basement mechanical room, first floor future build out and the second floor addition of 7 new OR’s. A majority of the existing hospital was also renovated into new pre and post op areas on the second floor. In the new addition corridors and shafts were undersized so very detailed coordination of all the MEP services was needed down to every last hanger in some instances. The floor elevations matched the existing structure which made coordination on this project extremely difficult. In the area of renovation the elevation from the floor to the underside of the concrete slab was 10’ and an 8’-0” ceiling height was achieved. The building was built out of concrete so there were no beam pocket spaces to be utilized and there were existing sanitary lines that were in this ceiling space that needed to stay which made the coordination process extremely difficult. We were responsible for working with the contractor to field verify all the existing sanitary lines and evaluate in the coordination process which ones could stay and which ones would have to be re ran to mesh with the new MEP services serving this part of the hospital. The drawings were then used by the field to install and re route the new and existing lines.

 

Beaumont Hospital Bridge Project – Troy & Sterling Heights, MI

Ron George Design worked with the lead plumbing contractor to provide 3D CAD coordination for the new bridge that connected two parts of the hospital across a busy road and also linked the two facilities together from two different cities. This bridge provided MEP and hospital services to and from both facilities as they were working together as one facility and the bridge was the hub that connected them. We were responsible for the plumbing in the bridge and BIM was a great on this project because it allowed the bridge which was sloping upward to match the existing buildings services exactly as planned with few interferences and maintain the ceiling in the bridge as high as possible.

 

Industrial Projects


Industrial Projects Experience:

Caterpillar Corporation,

Building VV Addition,  Peoria, IL.

 

Daimler / Chrysler Automotive Corporation,

New Headquarters Building 16 - Stories, Auburn Hills, MI.

 

Daimler / Chrysler Automotive Corporation,

Information Services Offices, Auburn Hills, MI.

 

Daimler / Chrysler Automotive Corporation,

Materials Lab, Auburn Hills, MI.

 

Daimler / Chrysler Automotive Corporation,

Building 18 Expansion, Auburn Hills, MI.

 

Daimler / Chrysler Corporation,

New Paint Shop, Newark, DE.

 

Daimler / Chrysler Corporation,

Power House & Air Compressor Plant, Dayton, OH.

 

Ford Motor Company,

Scientific Research Lab, Dearborn, MI.

 

General Motors Corporation

Vehicle Assembly Plant , Lake Orion, MI.

 

General Motors Corporation,

Vehicle Proving Grounds, Milford, MI.

 

General Electric Co.

Aircraft Engine Turbine Plant, Greenville, SC.

 

Kodak Co.

Film Processing Facility,  Rochester, NY.

 

Kimberly/Clark Paper Company, 

Pulp and Paper Mill, Jenks, OK.

 

Governmental Projects


Governmental Projects Experience:

National Institute for Standards & Technology NIST

Fuel oil system study.  Forensic evaluation and failure analysis for the existing power plant fuel system.

 

National Institute for Standards & Technology NIST

Fuel Oil System design for the new power plant expansion.

 

Tarrant County Texas, City/County Jail and Courts Complex

8-Story Jail & Courts Building, Fort Worth, TX.

 

Burnett Park Fountains,

Decorative Water Fountains, Fort Worth, TX.

 

Lake County Jail, County Jail and Criminal Justice Facility

Crown Point, IN.

 

Spencer County/Jail

Rockport, IN.

 

Noblesville Park & Recreation Department, 

(2) Golf course irrigation systems with pump houses, Noblesville, IN.

 

Texas State Capital Building,

Renovation of Lt. Governor’s Quarters, Austin, TX.

 

Texas State Capital Building,

Renovation of the State Senate Chambers, Austin, TX.

 

Utility Projects


Utility Projects Experience:

Texas Utilities – Comanche Peak Nuclear Power Plant

Pipe Support Design & Engineering to NRC Requirements, Glen Rose, TX.

Village Creek Wastewater Treatment Plant, Fort Worth, TX.

National Institute for Standards & Technology NIST

Fuel Oil System design for the New Power Plant Expansion

Michigan Bell Telephone Company, 

24 - Fuel Oil Tank & Piping Projects for telephone switching centers. New emergency generators & double wall diesel fuel tanks with double wall fuel oil piping & leak detection and tank inventory monitoring systems.

-Detroit, MI, multiple locations

-Cadillac, MI

-Marquette, MI

-Lansing, MI

-Grand Rapids, MI

-Pontiac, MI

-Birmingham, MI

-Ann Arbor, MI

-Port Huron, MI

-Saginaw, MI

-Farmington Hills, MI

-Bloomfield Hills, MI

-Jackson, MI

 

Institutional Jail/Prison Projects


Institutional – Jail / Prison Projects Experience:

Texas Department of Corrections, Cofield Unit

2500‑man Prison, Huntsville, TX

 

Texas Department of Corrections, Ellis II Unit

2500‑man Prison, Huntsville, TX

 

Texas Department of Corrections, Furgeson Unit

Additions and renovations, Huntsville, TX

 

Texas Department of Corrections, Pack III Unit

2500‑man Prison, Huntsville, TX

 

Ft. Worth/Tarrant County, City/County Jail

8-Story Building, Fort Worth, TX

 

Lake County Jail, County Jail and Criminal Justice Facility

Crown Point, IN

 

Spencer County Jail, 

Rockport, IN

 

Educational Projects


Educational Projects Experience:

Carmel High School, 

One million square foot addition to existing High School, Carmel, IN

 

Carmel High School, 

5000 seat Football stadium/Athletic complex, Irrigation system, showers/lockers, food service & support facilities, Carmel, IN.

 

North Branch High School,

New High School, North Branch, MI

 

University of Michigan – Dearborn Campus,

College of Science & Letters, Dearborn, MI

 

University of Michigan – Ann Arbor Campus

Life Sciences Laboratory Building

 

University of Michigan – Ann Arbor Campus,

Rackham Hall Renovations

 

University of Michigan – Ann Arbor Campus,

Palmer Drive Parking Structure

 

University of Michigan – Ann Arbor Campus,

New Palmer Drive Chiller Plant

 

University of Michigan – Ann Arbor Campus,

Commons Building, 8 story, conference center & cafeteria

 

University of Michigan – Ann Arbor Campus,

Palmer Drive “L” Building, 5-Story, Laboratory Classroom Building

 

University of Michigan – Ann Arbor Campus,

Palmer Drive Plaza - Fountains, drains & snow melt system

 

Michigan State University

Agricultural Hall - Lansing, MI

 

Michigan State University

Shaw Hall - Dormitory Building, Lansing, MI

 

Michigan State University

Shaw Lane - Parking structure, Lansing, MI

 

Michigan Technological University

Environmental Science Building, Houghton, MI

 

Delta College

Project A - Industrial Arts Building renovations and addition, Saginaw, MI

 

Delta College

Project B - Swimming Pool, Physical Education, and Cafeteria Renovations and Additions, Saginaw, MI

 

Delta College

Fire Protection Master Plan, Saginaw, MI

 

Military Projects


Military Projects Experience:

U. S. Navy, Bachelor Enlisted Quarters,

(9) – High Rise Apartment Buildings, Great Lakes Naval Training Center, IL

 

U. S. Navy, Naval Facilities Command NAVFAC‑Chesapeake,

Ship Materials Technology Facility, Naval Surface Warfare Center, Bethesda, MD

 

U. S. Navy, Aircraft Maintenance Hanger,

Naval Air Station, Dallas, TX

 

U. S. Army, Aircraft Maintenance Hanger & Shops,

Robert Gray Army Airfield, Fort Hood, TX

 

U. S. Army, Barracks Rehabilitation, 

Foot Hood, Fort Hood, TX

 

U. S. Air Force, Enlisted personnel Dining Facility,

Carswell AFB, Fort Worth, TX

 

U. S. Air Force, Enlisted Personnel Housing,

Carswell AFB, Fort Worth, TX

 

U. S. Army, Armored Vehicle Weapons Training Center.

Survey and Renovation of Mechanical Systems in 500 Barracks and Support Buildings, Fort Polk, LA

 

U. S. Army, Senior Non‑Commissioned Officers Academy, 

Fort Bliss, TX

 

U. S. Navy, Water Tower & Pump House Building,

400,000 gallon water tower to provide adequate water pressure for several new buildings,

Great Lakes Naval Training Center, IL

 

Commercial Projects


Commercial Projects Experience:

Sky Chefs, Commercial Airlines Kitchen

Dallas/Fort Worth Airport, TX

 

Sky Chefs, Commercial Airlines Kitchen

Los Angeles International Airport, CA

Waller Creek Office Tower and Parking Garage, 

12 Story Office/Parking Garage, Austin, TX

 

Allied Bank and Office Tower, 

4 - story building, Port Arthur, TX

 

Federal Office Building,   

4 - story building, Port Arthur, TX

 

Midland Plaza, Office Building, 

6 – Story building, Midland, TX

 

Savings West Office Building, 

7 – Story office building, Fort Worth, TX

 

Waller Creek Hotel and Restaurant,

12-story hotel & Restaurant building, Austin, TX

 

COBO Hall

Expansion & Renovations of Convention Center, Concessions & Restrooms, Detroit, MI

 

Cottonwood Village Apartments, 

Dallas, TX

 

Federal Express Freight Facility, 

Indianapolis, IN

 

Park Central Bowling Lanes, 

Bowling Center, Fort Arthur, TX

 

Park Central Shopping Center,  

Shopping Mall, Port Arthur, TX

 

Regency Park Condominiums,

2-story condos, Port Arthur, TX

 

Wedgewood Station Post Office

Altamesa Boulevard, Fort Worth, TX

 

MGM Casino/Hotel

Detroit, MI

 

Book Cadillac Marriott Hotel/Apartments

Detroit, MI

 

YMCA Health Club, Detroit

Detroit, MI

 

YMCA Health Club, Milford

Milford, MI

 

Retail Projects


Retail Projects Experience:

Meijer Stores Projects 

Store #25 Addition., Okemos, MI;  Store #30 Remodel, Jackson, MI;  Store #51 Addition. & remodel, Findlay, OH

Store #117 Sylvania Twp., OH;  Store #119 Kalamazoo, MI;  Store #124 Fort Wayne, IN;  Store #125 Fort Wayne, IN

Store #126 Mansfield, OH

 

Super K-Mart Stores

Terre Haute, IN

Evansville, IN

Spartanburg, SC

Greenwood, CO

 

Mervyn’s Department Store

Flint, MI

 

Laboratory Projects


Laboratory Projects Experience:

University of Michigan – Ann Arbor Campus

Life Sciences Laboratory Building

 

Daimler / Chrysler Corporation, Materials Lab

Auburn Hills, MI

 

E.I. DuPont Co.

Medical Products Research Laboratory and Chambers Works Plant, Deepwater, NJ

 

Ford Motor Company

Scientific Research Lab, Dearborn, MI

 

University of Michigan - Dearborn

Collage of Science & Letters, Dearborn, MI

 

Michigan State University - Agricultural Hall

Agriculture Science Labs - Lansing, MI

 

Michigan Technological University

Science Building,  Houghton, MI

 

Harper Hospital

Cardiac Catheter Lab. - Harper Hospital Projects

 

Beaumont Hospital,

Anatomic Pathology Lab, Royal Oak, MI

 

Vic Wertz, Clinical Cancer Research Center,

Wayne State University/Detroit Medical Center, Detroit, MI

 

Stadium/Assembly Building Projects


Stadium/Assembly Building Projects Experience:

New Major League Baseball Stadium, Detroit Tigers – Comerica Park   

Detroit, MI

New National Football League Foot Ball Stadium, Detroit Lions – Ford Field  

Detroit, MI

Renovations - Will Rogers Memorial Coliseum Renovations – Multi Use Arena

Fort Worth, TX

New Detroit Lions – Headquarters and Training Facility 

Allen Park, MI

 

Airport Projects


Airport Projects Experience:

Dallas / Fort Worth International Airport

Terminal 3E HVAC Improvements

Terminal 3E Admirals Club

Terminal 2W Renovations

Terminal 3E Airside Expansion

Terminal 4E Section C Federal Inspection Facility

Terminal 2E-3E Apron Control Tower

Terminal 3E Section C Expansion

Terminal 3E A & B Lounge & Restroom addition

Terminal 3E Rest Room Addition

 

Cleveland Hopkins International Airport

New Concourse D and Connector Tunnel

 

Detroit/Wayne County Metropolitan Airport 

New Midfield Terminal – Ed McNamara Terminal

 

Detroit/Wayne County Metropolitan Airport 

Regional Commuter Terminal